Siemens Energy




Key Stats:

Installation time: 2 days

Foundations: 16 Rapidpads

Custom elements: Bespoke double door access step and 32mm composite skirting

Client

Wernick, in partnership with Siemens Energy

The Challenge

Siemens Energy required a modern welfare solution that could be installed quickly, provide reliable access, and maintain a professional appearance on site. The project also needed bespoke features to meet the client’s specific layout and design requirements.

Our Solution

Working together with Wernick, we delivered a tailored welfare setup installed on Rapidpad Foundations. To ensure accessibility and durability, the project included:

– Custom-built step leading to double entrance doors

– Composite skirting fitted around the perimeter for protection and a smart finish

– Sleek design that integrates seamlessly with the site environment

The Result

The completed setup provides safe, durable, and visually appealing welfare facilities for Siemens Energy. The bespoke step and composite skirting add both practicality and a refined look, creating a solution that is built to last.